| |
T. |
U. |
|
|
V.
 |
This exterior sand and cement moulding was run on a shell shaped wall that was to be
used as a fountain. We had to do this project in the winter, so we created a tent over the
wall and heated the area. We then added accelerators to the plaster so that the plaster would go
through the hardening process before the evening freezing temperatures. The first photo
shows the moulding being run. The second shows the corners being formed with a tool
called a miter rod. The last photo is the finished product.
|
|